Top 10 perovskite battery manufacturers with their official websites, technological breakthroughs, and capacity layouts:
Website: https://www.gcl-perovskite.com
Technical Breakthrough: The first global enterprise to achieve 26.17% efficiency in perovskite tandem modules. Its GW-scale production line uses 2m×1m modules, compatible with silicon-based production line upgrades.
Capacity Layout: Planning 25.8 GW capacity by 2025, with a 100 MW pilot line completed and GW-scale bases under construction, covering orders from leading clients.
Website: https://www.microquanta.com
Technical Breakthrough: Published the 3D laminar flow field technology (LAD) as the sole first author in Science, achieving module yield over 98.5%. The 0.79㎡ module efficiency of 15% is listed in Solar Cell Efficiency Tables.
Capacity Progress: The world’s first 100 MW mass production line is operational, with two 500 MW lines launched in 2025. Products applied in the 523.8 kWp commercial power station in Quzhou, Zhejiang.
Website: http://www.utmolight.com
Mass Production Breakthrough: The world’s first GW-scale perovskite module production line went into mass production in February 2025, with 2.8㎡ modules achieving 16.1% efficiency, targeting 20% by the end of the year.
Technical Edge: Broke the module efficiency world record 7 times, with BIPV products applied in high-end European construction markets.
Website: https://www.cnnosolar.com
Technical Path: Adopts all-perovskite single-junction technology, with 16.5% efficiency in 200 MW fully automated production lines, aiming for 20% by 2025.
Equipment Innovation: The first in the industry to realize full-process domestic equipment application, leading in automation and cost control.
Website: http://www.wondersolar.cn
Technical Feature: Focuses on flexible perovskite battery R&D, with bendable modules achieving 14.8% efficiency, suitable for vehicle-mounted energy and wearable devices.
Capacity Progress: 100 MW-level production line completed equipment debugging, launching mass production in Q3 2025, with an annual capacity of 150 MW.
Website: https://www.renshinesolar.com
Technical Breakthrough: Developed perovskite-organic tandem batteries with 26.4% efficiency, certified by the National Renewable Energy Laboratory (NREL).
Capacity Plan: Two 500 MW production lines scheduled for commissioning before the 2026 Spring Festival, targeting high-efficiency indoor photovoltaic markets.
Website: https://www.longi.com/cn
Technical Route: Tandem perovskite-silicon batteries achieve 33.9% efficiency in the lab, with a theoretical limit of 43%, boasting deep technical reserves.
Capacity Layout: 100 MW pilot line completed verification module delivery, planning to launch GW-scale tandem battery mass production in 2026.
Website: http://www.tongwei.com.cn
Technical Breakthrough: Tandem perovskite-silicon batteries achieve 34.17% efficiency, completing equipment selection for MW-level test lines.
Capacity Plan: Launched perovskite pilot line construction in 2025, targeting GW-scale capacity by 2027.
Website: https://www.trinasolar.com
Patent Edge: Holds the world’s first (481) perovskite battery patent applications, covering tandem structures and packaging processes.
Market Layout: European market orders account for over 40%, with BIPV products entering high-end construction projects in Germany and the Netherlands.
Website: https://www.jnjing.com
Material Breakthrough: TCO conductive film glass holds over 90% domestic market share, serving as a core auxiliary material supplier for perovskite batteries.
Capacity Scale: Three TCO glass production lines with a designed capacity of 45 million ㎡/year, supporting global GW-level module production.